1/4-MileElectrified Roadway

To reduce emissions from short-distance drayage routes, ASPIRE will install a dynamic charging system at the Utah Inland Port. This will include two dynamic wireless power transfer (DWPT) systems: one co-developed with ASPIRE’s team at Purdue University and one using the Electreon DWPT system.

Read More

1-Megawatt Static Charger 

To address the poor air quality along the Wasatch Front, ASPIRE has partnered with Kenworth, UPS, and WAVE to create two zero-emissions routes using a battery-electric Kenworth truck powered by two static 1-megawatt chargers. Developed by ASPIRE’s team at USU, this 1-MW WPT system will be deployed at the EVR in Logan and the Utah Inland Port in Salt Lake City. 

Read More

I-15 Corridor Project

ASPIRE received a grant from the Department of Energy to develop a plan for multi-modal electrification along the Wasatch Front. The project will deliver a 20-year medium- and heavy-duty zero-emission vehicle (MHD ZEV) infrastructure deployment plan — benefitting the communities that experience the most impacts from freight emissions.  

Read More